The crane is intended for high precision mounting operations at the shipbuilding works.
The large lifting capacity and span of crane, high accuracy of position control at load transportation, ensuring of turning over the suspended load by 180˚ as well as possibility of dual joint operation of two cranes lifting and transferring loads of up to 900 t mass increase the range of crane use.
Specifications
Crane lifting capacity, t: | 480 |
total | 2х160 |
upper trolley | 160 |
lower trolley | 115 |
Number of trolleys, nos. | 2 |
Hook lifting height, m: | |
total | 66 |
above crane rail head | 56 |
Lifting speed, m/min | 0,3 ÷ 6 |
Traveling speed, m/min | |
crane | 0,6 ÷ 30 |
trolley | 0,4 ÷ 20 |
Supply voltage of power network, V | 6000 |