The crane is intended for high precision mounting operations at the shipbuilding works.
The large lifting capacity and span of crane, high accuracy of position control at load transportation, ensuring of turning over the suspended load by 180˚ as well as possibility of dual joint operation of two cranes which lifting and transferring loads of mass up to 900 t increase the range of crane usage.
Specifications:
Lifting capacity, t: | |
total | 100 |
electric hoist | 10 |
Span, m | 42 |
Quantity of trolleys | 1 |
Hook lifting height, m: | 20 |
Lifting speed, m/min | 3,8 |
Traveling speed, m/min | |
crane | 22,5 |
trolley | 33,8 |
Supply voltage of power network, V | AC 380 |